EN
134
INSTALLATION OF THE CHIMNEY HOOD
Fig. 21
Fig. 22
Fig. 23
Fig. 24
Correct
Incorrect
Fixing of the aluminium duct
Install the plastic outlet to one side of the aluminium duct.
Please make sure that you
fi
xed other side of the aluminium duct
to the kitchen chimney.
Please make sure that this connection is strong enough not to
break when the hood is on in the highest level. Fig. 21
Install chimnies around the hood body
In the models of 2120 and 2220 you should
fi
x the chimney with
3,9x x 9,5 RYSB screws to the body. Fig. 22
To mount the upper chimney: move it upward and
fi
x it by screws
in its upper end to the plate for
fi
xing the chimneys which is
preliminary
fi
xed to the wall. Fig. 23
You should drive the internal chimney with the screws from the
upper external edges to the chimney installation plate which was
fi
xed on the wall. Fig. 24