© 2017 Linkam Scientific Instruments Ltd.
20
v1.1.0
1.
Humidity sensor temperature
2.
Relative humidity reading
3.
Relative humidity control
4.
Manual RH95 control
·
The humidity sensor also contains a temperature sensor. The RhTemp display (1) shows the current temperature at the humidity sensor in
degrees Celsius.
·
The Rh reading (2) shows the current humidity of the chamber as a percentage.
·
The desired Rh% for the current ramp can be set using the RH control (3).
Manual RH95 Control
This screen provides information on the current status of the RH95 and manual humidity controls. These controls can only be used when the system
is inactive, if there is a ramp in progress they will be greyed out and inaccessible.
1.
Graphical display of the RH95 system status
2.
RH95 water bottle temperature
3.
Heater wire power level.
4.
Drying time display
5.
Swap time display
6.
RH% manual control
7.
Start button
8.
Drying control
·
The graphical display (1) will update to show which desiccant tube is currently drying out by highlighting it in red, and a blue arrow will appear
next to the currently active tube.
·
The water temperature display (2) shows the temperature of the water bottle in the RH95.
·
The humidity supply tube has a heater wire inside it to maintain the air temperature. The power display (3) shows the power being put into this
heater wire as a percentage of maximum.
·
The drying time display (4) shows the amount of time remaining on the current drying cycle, which is the currently inactive desiccant tube being
dried out.
·
The swap time display (5) shows the amount of time remaining before the active tube is swapped, and a drying cycle started on the previously
active tube.
·
The Rh setpoint control (6) is used to manually set a Rh% without linking to a heating or cooling ramp.
·
The start button (7) will begin changing the chamber humidity to that set in the Rh setpoint control.
·
The drying control (8) begins a drying cycle. This flows warm air through both desiccant tubes to dry them out. This action should be performed
after you first receive your RH95 system.