Linkam Scientific Instruments CCR1000 User Manual Download Page 11

 

11 

Load A sample 

 

Remove Sample Holder 

Before removing the sample holder please ensure 
that the heater assembly has cooled to room tem-
perature.    When  using  the  Loading  Tool,  care 
must  be  taken  as  the  heater  assembly  is  very 
fragile.   
 
Remove lid by unscrewing anti clockwise. 
 
 
 
Remove the 22x1mm quartz window. 
 

 

 
 
 
 
 
 
 
 
 
 
 
Use  the  Sample  Holder  Removal  Tool  (1)  as 
shown in the  picture.   
 
Carefully lower the Sample Holder Removal Tool 
over the Sample Holder (2).   
 
The  next  step  requires  great  care  and  minimal 
force.    Once  the  tool  is  axially  aligned  with  the 
sample holder it will need to be pressed over the 
outer diameter of the Sample Holder.  Rotate the 
tool  slightly  to  make  this  easier.    The  tool  will 
come  to  a  stop  after  approximately  1.5mm.    No 
further  force  is  required  otherwise  the  user  risks 
damaging the heater assembly.  Gently pinch the 
tool with a thumb and fore finger.  This will allow 
the  tool  to  grip  the  outer  diameter  of  the  sample 
holder.   
 
Lift  the  tool  vertically  away  from  the  CCR1000.  
If  the  sample  holder  is  lifted  out  at  an  angle  it 
could break.    

 
 

 
 
 
 
 

Lift Vertically 

Summary of Contents for CCR1000

Page 1: ...CCR1000 Catalyst Cell Reactor Linkam Scientific Instruments USER GUIDE...

Page 2: ...cope with Dovetail Substage 7 Set Up the CCR1000 8 Electrical Cable Connectors 8 Connection to T95 System Controller 9 Connect the ECP Water Circulator Pump 10 Connect the Gas Lines 10 Pressure Warnin...

Page 3: ...with us to Activate your warranty and technical support Access the online setup videos Permanently unlock the Linksys32 software if purchased If you have purchased Linksys32 software please install t...

Page 4: ...isuse operation outside of the environmental specifications for the product or improper site preparation or maintenance Technical Support Any technical questions or queries should be addressed to the...

Page 5: ...oors 9 Each product is equipped with a 3 wire grounded earth mains plug or a free end 3 wire mains lead The plug only fits into a grounded type outlet The free end mains lead should be connected to a...

Page 6: ...y porous ceramic cloth filter Gas is introduced via a high pressure valve and is then heated by sample holder before passing through the sample A high pressure outlet valve can be connected to various...

Page 7: ...base of the stage using the supplied hex screws and the outer most holes in the base plate Adjust the two positioning screws 1 and the thumb screw 2 so that approximately 5mm of thread is exposed on...

Page 8: ...d with the CCR1000 1 CCR1000 2 Green Temperature Sensor Cable 3 Power Cable 4 Stage Connection Lead Electrical Cable Connectors Plug in the green Temperature Sensor cable to stage Make sure the and ma...

Page 9: ...95 System Controller From the stage connect the green Temperature Sensor cable to the Stage Socket 1 and connect the Stage Connection Lead to Stage Connection Socket 2 Refer to the T95 LinkPad Manual...

Page 10: ...ocate the gas line and connector into the stage body No force is necessary Now screw in the connector until it stops using only fingers No spanner is necessary unless using stainless steel tubing Note...

Page 11: ...Holder 2 The next step requires great care and minimal force Once the tool is axially aligned with the sample holder it will need to be pressed over the outer diameter of the Sample Holder Rotate the...

Page 12: ...ment Turn the Sample Holder upside down and with a forefinger and thumb gently rest it over the alu mina silica fabric 1 Once the sample holder is in position apply a very light force and rotate the s...

Page 13: ...to the central hole in the sample loading base until resistance is felt Excessive forces are not needed as the sample holder should slide into the sample loading base Place the Sample Loading Funnel 3...

Page 14: ...Holder into the heater assembly Rotate the sample holder to make sure that it is axially aligned with the heater assembly Once the sample holder is positioned in the heater assembly place a fore finge...

Page 15: ...nt Spares Kit CCR SLK Sample Loading Kit CCR CC Ceramic Cloth for Sample Loading 6x3 5cm x4 CCR CPF Cole Palmer Fitting with Ferrule x4 W22Q1 22mm Diameter Quartz Window 1mm thick x2 CCR ALSH Alumina...

Page 16: ...am Scientific Instruments Ltd Tel 44 0 1737 363 476 Fax 44 0 1737 363 480 Email support linkam co uk Unit 8 Epsom Downs Metro Centre Waterfield Tadworth Surrey KT20 5LR UK www linkam co uk Version 1 0...

Reviews: