8
Ékszíjas meghajtású, olajkenésű, dugatt
LINCOS Slovenia
STD-3550
Two Post Lift - Electrical Release
terminal
board.
Cut and Connect Power wire to the terminal board D1, D2, D3
5. Fix the rubber ring to protect the wires, at last mount Electromagnet cover.
6. MOUNTING CHAIN COVER. Chain cover parts inside spare parts box, fix
from the bottom with screw and upside with hook.
STEP FIVE: INSTALLING HYDRAULIC HOSE
Install the hydraulic lines as shown in HYDRAULIC CONNECTION, paying carful
attention to keep the hoses clean and free of debris.
STEP SIX: ROUTING THE EQUALIZER CABLES.
1.
Raise and lock each carriage approximately 800mm high above the ground.
2.
Make sure that the safety locks on each column are fully engaged before
attempting to route equalizer cables.
3.
Carriages must be equal height from the floor before proceeding
4.
With the carriages in equal position from the floor, route the equalizer cables
as shown
5.
After the equalizer cables have been routed, adjust each cable so that they
are equal tension.
STEP SEVEN: MOUNTING THE CHAIN COVER.
1. The chain cover installation outside of the electromagnet
2. Mounting screws
STEP EIGHT: INSTALLING THE LIFTING ARMS
Install the swing arms on the carriages using the included pins. Check for proper
engagement of the arm lock.
STEP NINE: FILL THE RESERVOIR.
STEP TEN: MAKE THE ELECTRICAL HOOKUP TO POWER UNIT.