Spirit II User’s Manual
Section 4: Operation with Automatic Gas Console
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
4-19
Pressures/Coolant Tab
Press the Diagnostics navigation button followed by the Pressures/Coolant tab to
access the screen described below.
Pressing any of the Output Pressure buttons will cause the corresponding valve
to open or close. Note that the preflow valve and the plasma valve cannot be on
at the same time. During a cutting or marking sequence, the status of all valves
will display N/A.
See the Installation Section to initially fill the system with coolant. See the
Maintenance Section for the procedure to refill or flush coolant.