Checklist - First time installation
To guide you through the process of integrating the first LA25 IO-Link in your system, here is a checklist
with the most important steps to consider:
Configure the IO-Link master to “Type B / Class B”
Make sure that the amperage rating of the IO-Link master port is sufficient (min. 2 A)
If not, we strongly recommend to power the motor seperately (
)
Plug in the M12 connector or wire up the actuator with flying leads to the master
Make sure you receive data from the actuator
Indicating that communication is OK
Make sure that the data order is correct
Read more about this
Start moving!
Send a “clear error command”
0xFFFC or 65532
F O R M O U N T I N G I N S T R U C T I O N S A N D G U I D A N C E I N U S A G E , P L E A S E S E E T H E R E L E V A N T U S E R M A N U A L S
Copyright © LINAK
2021.11
. MA-M9-02-844
. LINAK
A/S reserves the right to mak
e technical alter
ations