13
Install Aurora SE with NDBs and Power Top-Ups
Required Components
• Aurora SE with NDB(s)
• LED Pixel Strands
• Power T(s)
• 5 A Power Top-Ups
Method
1. Install Aurora SE with NDB(s) using the instructions in the previous sections
2. Power Aurora and all power supplies off.
3. Connect each Power T to a Power Top-Up
4. Connect the Power Ts and Power Top-Up(s) to the end of each LED pixel strand
installed in step 1.
5. Connect additional LED pixel strands to the Power Ts installed in the last step.
6. Connect additional Power Ts, Power Top-Ups, and LED pixel strands as
required. Make sure not to exceed 80-100 LED pixels per Power Top-Up.
7. Power Aurora SE and all Power Supplies ON.
8. Configure NDBs, audio settings, and customize your light show using the
Aurora Mobile App. Refer to the Aurora Mobile App Manual for more details.