16
X
SECTION 3 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
3.5
(x1)
3.6
• Lay the
Backboard (AJI)
on a table or bench. Insert the
U-Bolt (AOU)
through the upper part of the opening on the backside of
the
Backboard (AJI)
as shown.
• Insert the U-Bolt (AOU) through the top holes of the Backboard and the Rim.
!!
1/2" (13mm)
AOU
(x1)
AOU
DFD
• Connect the
Rim (ALX)
and
Plastic Guard (ALD)
to the
Backboard (AJI)
with the hardware shown.
ALX
ALD
AJI
ABK
AOU
EAP
ABK
(x2)
ABK
EAP