19
MN
MG
MB
AN
AN
30
5IFSFNVTUCFBwYw4QBDFS ./CFUXFFOFBDI
4IPSU&YUFOTJPO"SN "/BOEUIFQPMF
Completely tighten the Nuts from steps 29
through 31.
(2)
MB
(1)
7 1/8”
(Not actual length)
w8SFODIFT
1039829
Required For This Page:
Attach the Net (AB).
Please call our Customer Service Department at
the number on Page Two to obtain replacement
Nets. Our Nets are shorter than average to reduce
the risk of entanglement.
31
32
Apply Grease (MO) to
these areas.
AB
MG
(1)
AS
MN
Summary of Contents for POWER LIFT 71281
Page 1: ...1...
Page 7: ...7 MH MQ MJ MS MI MB MR TA FA TC ML MN MM TB MG...
Page 22: ...22 XX 35 Attach the Pole Pad XX to the Pole with the top strap above the handle as shown...
Page 24: ...24 NOTES...
Page 25: ...25 NOTES...
Page 26: ...NOTES...