15
Step 7
1. Attach the left upper swing arm (8) to
the main frame (1). Fix with 3pcs
spring washer (31) and Allen cylinder
head full thread bolt (30).
Attention: Please put all the bolts and washers
on the frame holes first, then secure them.
Step 8
1. Put the hand pulse communication
line (15) through the hole of main
frame (1) to the console fix plate.
2. Attach the handlebar group (9) to the
main frame (1), fix with 4pcs flat
washer (33) , spring washer (27),
Allen pan head full thread bolt (32)
and 2 pcs curved washer(24), spring
washer (27), Allen pan head full
thread bolt (32).
Attention: Please put all the bolts and washers
on the frame holes first, then fix them.
Summary of Contents for ST-13
Page 5: ...5 3 EXPLODED DIAGRAM...
Page 6: ...6...