FlexPower Generation 2 DC Power System Installation Manual
2
3
Installation and Operation
FAI INPUT
FAI INPUT
SYS FLT
SYS FLT
AC FLT
AC FLT
BR
BR
DC1
DC1
V+
V+
V-
V-
DC2
DC2
DataLink
DataLink
AC Input
Flex IO
Earth
GND DET
Bat Det
Bat Det
120/230VAC
Cut for 230V
Cut for 230V
BAT
BAT
AC ON
12V
24V
B
B+
B
B–
+ – ++ – +
i
FPO
150 / 250
For UL compliance, the AC fault contact
must be monitored by a Listed control panel
2 1
AC
GND FLT
AC FLT
FAI
SYS FLT
2
1
Bat Set
Bat Set
2
1
DC2
DC1
REV BAT
DC2
DC1
FAI INPUT
FAI INPUT
SYS FLT
SYS FLT
AC FLT
AC FLT
12V
24V
Observe battery polarity
or damage may result
Observe battery polarity
or damage may result
i
AC Input
Flex IO
120/230VAC
Cut for 230V
Cut for 230V
FPO75
AC ON
DC2
DC1
REV BAT
GND FLT
AC FLT
FAI
SYS FLT
DataLink
DataLink
+ – ++ – +
B+
B+
B-
B-
BR
BR
DC1
DC1
DC2
DC2
For UL compliance, the AC fault contact
must be monitored by a Listed control panel
Earth
GND DET
2 1
Battery
Detect
Battery
Detect
2
1
Battery
Set
Battery
Set
2
1
AC
Summary of Contents for FlexPower Generation 2
Page 21: ...17 UL Compliance Verification...