1.2
Installing operator components: positioning and installation of the anchorage plate
The area in which the operator is installed must provide adequate space for performing maintenance and manual release operations.
a)
Adhere to the dimensions in
fig.2
.
Fig. (2)
335
51
170
58
2
00
3
22
170
192
59
61
z
99
81
z
15
AC003a
88
61
z
19
81
z
38
Fig. (3)
b) Observe the orientation in
fig. (3)
for positioning the operator anchorage plate (R – L).
c) Refer to
fig. (2.2)
for the respective heights for 16 or 18-tooth pinions.
d) Lay the electric cable pipes
(4)
, allowing them to protrude and plugging them to prevent them from
filling
with debris.
Fasten the anchorage plate
(1)
to the concrete base with 4 expanding screw anchors
(2)
, see
fig.(4.
2
)
; or sink in the fresh concrete folding the two
“L”s
(3)
, see
fig.(4.
1
)
.
Fig. (4)
1
4
350
250
200
3
AC005
2
1
AC010
4
350
250
200
AC010
35
Fig.4.1
Fig.4.2
ATTENTION: If the operator is subject to heavy work conditions or if the weight of the leaf is over 300 kg, the anchorage plate (1) must be sunk
into the concrete.
Left Hand
Right Hand