
Configuring Your Neutral and Ground Connections
18
6.5
Grounding Configuration, Corner-Grounded Delta or Impedance-Grounded Wye
As previously mentioned, Series 610 SCC requires a bypass input neutral for sensing and monitoring.
With a wye-connected input source, the installer should always connect the building service neutral to
the System Control Cabinet (SCC) output neutral to achieve this. When the building service is delta-
connected, however, the installer must take special steps to ensure reliable UPS functioning.
If the building service is corner-grounded delta or impedance-grounded wye, the UPS requires the
Series 610 Isolated Neutral Kit, as do each of the UPS modules. This kit uses control isolation trans-
formers to create a reference point. For this application, the SCC output neutral must
not
be bonded
to the SCC ground.
Figure 8
Grounding configuration, corner-grounded delta
Summary of Contents for SERIES 610
Page 6: ...iv...
Page 45: ...Installation Drawings 39 Figure 20 Battery power pack system 88 797616 03 Rev 08...
Page 46: ...Installation Drawings 40 Figure 21 Battery power pack Size A 88 797616 01 Rev 10...
Page 80: ...Installation Drawings 74...
Page 85: ...Site Planning Data Series 610 100 225kVA Multi Module Systems 79 NOTES...
Page 86: ...Site Planning Data Series 610 100 225kVA Multi Module Systems 80...
Page 87: ......