Unpacking the UPS and Site Preparation
6
2.0
U
NPACKING
THE
UPS
AND
S
ITE
P
REPARATION
2.1
Inspection
Upon receiving your Liebert GXT3-10000T230, examine the packaging for any signs of mishandling
or damage. While removing the packaging materials, inspect the UPS for damage. If any damage is
noted, notify your local Liebert representative and carrier. Any damage or missing parts must be
reported to the supplier within eight days of delivery.
2.2
Required Setup Equipment
The following tools are required to set up your UPS:
• pallet jack
• utility knife or scissors
• star head screwdriver
2.3
Unpacking
Take care when removing the packaging to avoid damaging the UPS. Do not dispose of the packing
material. The original packaging material should be used if the UPS needs to be repackaged, such as
for shipping. Check all packaging to ensure that no items are accidentally discarded. Remove the
packaging in the sequence shown below.
Figure 3
Unpacking
2.4
Storage
If the UPS will not be installed immediately, store the unit indoors in a clean and dry area. Protect all
the equipment, including its batteries, from extreme temperature, high humidity, spills and other
damaging conditions. Refer to
Table 11
for permissible environmental conditions for storage.
2.5
Handling
The equipment must be kept upright at all times and handled with care. It may be damaged if
dropped or subjected to severe impact.
Unlock
Plywood Case
Ramp in Slot
on Shipping
Pallet
Cushion
Ramp
Cushion
Pallet Jack
Cushions