Section 7. Communication with the MQTT protocol
Rebooting the instrument
To restart the instrument, send the following command:
mosquitto_pub -h
172.24.82.41
-t
"licor/niobrara/system/reboot"
-m
"reboot"
This initiates the restart cycle, beginning with a purge of the optics.
Powering off the instrument
To power off the instrument, send the following command:
mosquitto_pub -h
172.24.82.41
-t
"licor/niobrara/system/shutdown"
-m
"shutdown"
This initiates the shutdown, beginning with a purge of the optics. There is no com-
mand to power on the instrument remotely.
7-6
LI-7820 N₂O/H₂O Gas Analyzer
Summary of Contents for LI-7820
Page 1: ...LI 7820 N2O H2O Trace Gas Analyzer Instruction Manual ...
Page 2: ......
Page 10: ...viii ...
Page 28: ...Section 2 Getting started 2 12 LI 7820 N O H O Gas Analyzer ...
Page 36: ...Section 3 Applications of the LI 7820 3 8 LI 7820 N O H O Gas Analyzer ...
Page 52: ...Section 4 Software overview 4 16 LI 7820 N O H O Gas Analyzer ...
Page 66: ...Section 6 Maintenance 6 8 LI 7820 N O H O Gas Analyzer ...
Page 84: ...Appendix B Additional safety information B 6 LI 7820 N O H O Gas Analyzer ...
Page 91: ......