Installation Manual
35
ENGLISH
Indoor Unit Drain Piping
Long pipe setting
In cases where the Outdoor unit is
installed above the Indoor unit
perform the following.
1. Tape the piping and connecting cable from
down to up.
2. Secure the taped piping along the exterior
wall. Form a trap to prevent water entering
the room.
3. Fix the piping onto the wall by saddle or
equivalent.
Settlement of outdoor unit
1. Anchor the outdoor unit with a bolt and
nut[ø10mm(0.39in)] tightly and horizontally on
a concrete or rigid mount.
2. When installing on the wall, roof or rooftop,
anchor the mounting base securely with a
nail or wire assuming the influence of wind
and earthquake.
3. If the vibration of the unit is transmitted to the
hose, secure the unit with an anti-vibration rubber.
Seal a small opening
around the pipings
with gum type sealer.
Trap
1. Open the top cover of outdoor unit.
2. Set the ZONE SW1(SW01N) as below Fig.
3. Close the top cover and check whether
the product works normally.
WARNING: Do not open the top
cover or Set the pipe length
when operating the product.
1
SW01N
2
3
4
1
1 means S/W up.
0 means S/W down.
✽
2
3
4
0
0
0
1
Summary of Contents for UU24WD
Page 44: ...P No MFL40910603 ...