8 Room Air Conditioner
Installation
Suggested tool Requirements
SCREW, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
• PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet at both sides
and at the back. Keep these two screws which fasten the
cabinet at both sides for later use.
2. Slide the unit out from the cabinet by gripping the base pan
handle and pulling forward while bracing the cabinet.
3. Cut the window sash seal to the proper length. Peel off the
backing and attach the Foam-PE to the underside of the
window sash.
4. Remove the backing from Foam-PE with 3 holes and attach
it to the bottom of the Top retainer bar.
5. Attach the Top retainer bar onto the top of the cabinet with
3 screws (Type A).
6. Insert the Frame guides into the bottom of the cabinet.
7. Insert the Frame Curtain into the Top retainer bar and
Frame guides.
8. Fasten the curtains to the unit with 10 screws (Type A) at
both sides.
Foam-PE
Top retainer bar
Top retainer bar
Foam-PE
Screw
(Type A)
Screw(Type A)
Frame guide
Shipping screws
Thermostat
Operation
Wait T
hree M
inutes
Before R
estartin
g
Cooler
Warmer
Off
Auto S
wing
Off
On
Fan
Fan
Low Heat
Low Cool
High C
ool
High H
eat
Therm
ostat
Operati
on
Wait Th
ree Min
utes
Before
Restart
ing
Cooler
Warmer
Off
Auto Sw
ing
Off
On
Fan
Fan
Low Hea
t
Low Coo
l
High Co
ol
High He
at
Figure 1
Figure 2
Figure 3
Figure 4
Summary of Contents for M2400HR
Page 35: ...Service Manual 35 Memo ...