
6-1
SVC TEST MODE
Sequence of SVC Test Mode
To enter the test mode, follow these steps:
(1) press the Clear button
(2) press the upper BAKE and BROIL buttons at the same time
(3) press the upper BAKE and BROIL buttons at the same time again.
(4) ) press the NUM 0 button.
(5) Press the START button
Model Option
Software version
Only software version and “SVC TEST” is displayed
Summary of Contents for LWD3063BD
Page 38: ...5 1 Composition of control Wiring Diagram LWD3063ST 00 LWD3063BD 00 ...
Page 39: ...5 2 Composition of control Wiring Diagram LWD3063ST 01 LWD3063BD 01 ...
Page 76: ...9 1 SCHEMATIC DIAGRAM LWD3063ST 00 LWD3063BD 00 ...
Page 77: ...9 2 SCHEMATIC DIAGRAM LWD3063ST 01 LWD3063BD 01 ...
Page 80: ...9 5 Bake Roast mode Self Clean mode ...
Page 81: ...9 6 Warm Proof mode ...
Page 85: ... EV CONTROLLER PARTS 2381 2050 2119 2118 W258 260M 2055 3006 260B 2042 2041 2043 2044 ...
Page 89: ......