1) Re-air purging
(Re-installation)
• Procedure
(1) Confirm that both the 2-way valve and the 3-
way valve are set to the closed position.
(2) Connect the charge set and a gas cylinder to
the service port of the 3-way valve.
– Leave the valve on the gas cylinder closed.
(3) Air purging.
– Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare
nut on the 2-way valve approximately 45° for 3
seconds then closing it for 1 minute; repeat 3
times.
– After purging the air, use a torque wrench to
tighten the flare nut on the 2-way valve.
(4) Check for gas leakage.
– Check the flare connections for gas leakage.
(5) Discharge the refrigerant.
– Close the valve on the gas cylinder and
discharge the refrigerant until the gauge
indicates 3 to 5 kg/cm
2
g.
(6) Disconnect the charg e set and the gas
cylinder, and set the 2-way and 3-way valves
to the open position.
– Be sure to use a hexagonal wrench to operate
the valve stems.
(7) Mount the valve stem nuts and the service
port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
* CAUTION:
Do not leak the gas in the air during Air
Purging.
Lo
Closed
OPEN
Closed
Gas cylinder
R22
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
2-Way
valve
3-Way
valve
Summary of Contents for LS-J0766ML
Page 1: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 11: ......
Page 13: ......
Page 14: ......
Page 55: ... 2 MAIN P W B ASSEMBLY DC PART TOP VIEW 2 MAIN P W B ASM DC BOTTOM VIEW ...
Page 56: ... 3 DISPLAY ASSEMBLY 6871A20194 TOP VIEW 6871A30009 TOP VIEW BOTTOM VIEW BOTTOM VIEW ...
Page 57: ...Schematic Diagram TELEPHONE CONTROL MODEL ONLY 51 ...
Page 58: ......
Page 59: ......
Page 70: ...May 2002 Printed in Korea ...