2. Pumping down
• Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
– Remove the valve stem caps and confirm that
the valve stems are in the raised position.
– Be sure to use a hexagonal wrench to operate
the valve stems.
(2) Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
– Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
– Open the low-pressure valve on the charge set
slightly to air purge from the charge hose.
(5) Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
– Do this quickly so that the gauge ends up
indicating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valve’s stem nuts and the
service port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
Summary of Contents for LS-J0766ML
Page 1: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 11: ......
Page 13: ......
Page 14: ......
Page 55: ... 2 MAIN P W B ASSEMBLY DC PART TOP VIEW 2 MAIN P W B ASM DC BOTTOM VIEW ...
Page 56: ... 3 DISPLAY ASSEMBLY 6871A20194 TOP VIEW 6871A30009 TOP VIEW BOTTOM VIEW BOTTOM VIEW ...
Page 57: ...Schematic Diagram TELEPHONE CONTROL MODEL ONLY 51 ...
Page 58: ......
Page 59: ......
Page 70: ...May 2002 Printed in Korea ...