2) Balance refrigerant of the 2-way, 3-way valves
(Gas leakage)
• Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the back seat.
(2) Connect the charge set to the 3-way valve’s
port.
– Leave the valve on the charge set closed.
– Connect the charge hose with the push pin to
the service port.
(3) Open the valve (Lo side) on the charge set
and discharge the refrigerant until the gauge
indicates 0 kg/cm
2
G.
– If there is no air in the refrigerant cycle (the
pressure when the air conditioner is not
running is higher than 1 kg/cm
2
G), discharge
the refrigerant until the gauge indicates 0.5 to
1 kg/cm
2
G. if this is the case, it will not be
necessary to apply a evacuatin.
– Discharge the refrigerant gradually; if it is
discharged too suddenly, the refrigeration oil
will also be discharged.
Lo
Open
Open
3-Way
valve
2-Way
valve
Gas side
CLOSE
OPEN
Outdoor unit
Liquid side
Indoor unit
-47-
Summary of Contents for LS-J0762YL
Page 66: ...Schematic Diagram 66 Indoor _YL _UL Series ...
Page 67: ... 67 Indoor _NM _NN Series ...
Page 68: ... 68 Outdoor 7K AC Series ...
Page 69: ... 69 Outdoor 12K AC Series ...
Page 70: ... 70 Outdoor 9K DC Series ...
Page 71: ... 71 Outdoor 12K DC Series ...
Page 78: ...Memo 78 ...
Page 79: ...P No 3828A20177G December 2004 Printed in Korea ...