1) Re-air purging
(Re-installation)
• Procedure
(1) Confirm that both the 2-way valve and the 3-
way valve are set to the closed position.
(2) Connect the charge set and a gas cylinder to
the service port of the 3-way valve.
– Leave the valve on the gas cylinder closed.
(3) Air purging.
– Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the
flare nut on the 2-way valve approximately
45° for 3 seconds then closing it for 1 minute;
repeat 3 times.
– After purging the air, use a torque wrench to
tighten the flare nut on the 2-way valve.
(4) Check for gas leakage.
– Check the flare connections for gas leakage.
(5) Discharge the refrigerant.
– Close the valve on the gas cylinder and
discharge the refrigerant until the gauge
indicates 3 to 5 kg/cm
2
g.
(6) Disconnect the charg e set and the gas
cylinder, and set the 2-way and 3-way valves
to the open position.
– Be sure to use a hexagonal wrench to
operate the valve stems.
(7) Mount the valve stem nuts and the service
port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
* CAUTION:
Do not leak the gas in the air during Air Purging.
Lo
Closed
OPEN
Closed
Gas cylinder
R22
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
2-Way
valve
3-Way
valve
-46-
Summary of Contents for LS-J0762YL
Page 66: ...Schematic Diagram 66 Indoor _YL _UL Series ...
Page 67: ... 67 Indoor _NM _NN Series ...
Page 68: ... 68 Outdoor 7K AC Series ...
Page 69: ... 69 Outdoor 12K AC Series ...
Page 70: ... 70 Outdoor 9K DC Series ...
Page 71: ... 71 Outdoor 12K DC Series ...
Page 78: ...Memo 78 ...
Page 79: ...P No 3828A20177G December 2004 Printed in Korea ...