10 Floor Standing type Air Conditioner
Installation of Unit
Preparation of installation parts and tools
No.
Installation Parts, Tools
Use
1
Flaring tool (Ø 6.35 - Ø 28.7)
Flaring the pipes
2
Remear
Remove burrs from cut edges of pipes.
3
Pipe cutter (MAX 35mm Copper pipe)
Cutting the pipings
4
Wrench (H5, H4 hexagonal wrench)
To open the service valve
5
Pipe bender
Bending the pipings
6
Leak detector
Check a gas-leakage of connecting part
of the pipings
7
Manifold gauge
To measure the pressure, to charge the refrigerant
8
Charge-nipple
To connect the bombe
9
Vacuum pump
To remove the air in the pipe.
10
Charge cylinder balance
To measure the refrigerant amount
11
Bombe (Freon-22)
Gas charge
Cleaning the pipe
12
Spanner
To tighten the connecting parts of the pipings
13
Monkey spanner
14
Driver( , )
15
Benchi (150mm)
Cutting the wires
16
Tapeline
To measure the length
17
Core drill
To make holes through the concrete wall and blocks
18
Voltmeter, Amperemeter, Clampmeter
To measure the current and voltage
19
Insulation resistance tester
To measure the insulation resistance
20
Glass thermometer
To measure the intake and outlet air temperature of the indoor unit
21
Copper tubes
To use the connecting pipings
22
Insulation material
To cover the connecting pipings
23
Tape
To finish the connecting pipings
24
Electrical Leakage Breaker
To shut off the main power
25
Cable
To connect the cable from outdoor unit to indoor unit
26
Drain hose sockets, elbows
To remote the condensing water
Summary of Contents for LPUC808FA0
Page 20: ......