7.2 Pumping down
• Procedure
①
Confirm that both 3-way(liquid side) and 3-way(gas
side) valves are set to the open position.
• Remove the valve stem caps and confirm that the
valve stems are in the raised position.
• Be sure to use a hexagonal wrench to operate the
valve stems.
②
Operate the unit for 10 to 15 minutes.
③
Stop operation and wait for 3 minutes, then connect
the charge set to the service port of the 3-way (gas
side) valve.
- Connect the charge hose with the push pin to the
service port.
④
Air purging of the charge hose.
• Open the low-pressure valve on the charge
equipment slightly to purge air from the charge
hose.
⑤
Set the 3-way(liquid side) valve to the closed
position.
⑥
Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 1 kg/cm
2
g
⑦
Immediately set the 3-way(gas side) valve to the
closed position.
- Do this quickly so that the gauge ends up indicating
3 to 5kg/cm
2
g.
⑧
Disconnect the charge set, and mount the
3-way(liquid side) and 3-way(gas side) valve's stem
nuts and the service port nut.
- Use torque wrench to tighten the service port nut.
- Be sure to check gas leakage.
– 35 –
Lo
CLOSE
CLOSE
Purge the air
Gas side
Liquid side
Indoor unit
Outdoor unit
Closed
Open
3-Way
valve
3-Way
valve
Summary of Contents for LP-10091CL/XL
Page 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 10091CL XL LP 15091CL XL LP 20091CL XL ...
Page 7: ...2 1 LP 10091CL XL 2 2 LP 15091CL XL 2 3 LP 20091CL XL 7 2 DIMENSIONS ...
Page 53: ... 53 9 ELECTRONIC CONTROL DEVICE 9 1 MAIN P C B ASSY ...
Page 55: ... 55 10 SCHEMATIC DIAGRAM LP 10091CL XL LP 15091CL XL ...
Page 57: ... 57 22 19 10 4 5 1 12 21 20 15 13 16 2 9 8 7 18 17 6 3 11 14 ...
Page 62: ... 62 3 13 12 9 11 10 2 8 1 6 5 7 4 16 17 24 25 22 20 14 15 23 21 26 19 ...
Page 67: ... 67 3 13 12 9 11 10 2 8 1 6 5 7 4 16 17 24 25 22 20 14 15 23 21 26 19 ...
Page 76: ...11 6 Outdoor Unit LP 20091CL 20091XL 1 Exploded View 76 ...