– 30 –
6.9 Final Check and Test Run
After installing the unit, perform the final check and run-
ning test as follows:
Final check points
①
Is the unit securely mounted?
②
Is the installation location adequate?
③
Is the water piping work adequately and without
leakage?
④
Are trapped drain lines installed at condensate
drain connections?
⑤
Has the refrigeration cooling cycle been kept
sealed?
⑥
Is the electrical wiring adequate and are the
screws tightened on terminals?
After the above final checkings, prepare the running
test as follows:
①
Connect compound gauges to the check joints
at discharge and suction sides of the compres-
sor.
②
Turn all switches "OFF".
③
Turn the main switch "ON".
Running test should be accomplished as follows:
①
Set operation switch at "FAN" and the fan will
start. Check to ensure that the fan sounds nor-
mal.
②
Next, set it at "COOL" and the compressor will
start. Check to ensure that the compressor
sounds normal.
③
Check discharge and suction pressure on the
compound gauges.
④
Check working voltage, phase balance and run-
ning current.
⑤
Check to ensure that the thermistor functions
properly.
⑥
Check to ensure that the high pressure control
switch functions correctly.
Summary of Contents for LP-10091CL/XL
Page 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 10091CL XL LP 15091CL XL LP 20091CL XL ...
Page 7: ...2 1 LP 10091CL XL 2 2 LP 15091CL XL 2 3 LP 20091CL XL 7 2 DIMENSIONS ...
Page 53: ... 53 9 ELECTRONIC CONTROL DEVICE 9 1 MAIN P C B ASSY ...
Page 55: ... 55 10 SCHEMATIC DIAGRAM LP 10091CL XL LP 15091CL XL ...
Page 57: ... 57 22 19 10 4 5 1 12 21 20 15 13 16 2 9 8 7 18 17 6 3 11 14 ...
Page 62: ... 62 3 13 12 9 11 10 2 8 1 6 5 7 4 16 17 24 25 22 20 14 15 23 21 26 19 ...
Page 67: ... 67 3 13 12 9 11 10 2 8 1 6 5 7 4 16 17 24 25 22 20 14 15 23 21 26 19 ...
Page 76: ...11 6 Outdoor Unit LP 20091CL 20091XL 1 Exploded View 76 ...