(2) Evacuation
(All amount of refrigerant leaked)
• Procedure
1. Confirm that both the liguid side valve and gas
side valve are set to the opened position.
2. Connect the vaccum pump to the center hose of
the manifold gauge.
3. Connect the service port of the gas side valve to
the low side of the gauge.
4. Evacuation for approximately one hour.
- Confirm that the gauge needle has moved
toward-76 cmHg (vacuum of 4 mmHg or less).
5. Close the Low handle of the gauge turn off the
vacuum pump, and confirm that the gauge nee-
dle does not move(approximately 5 minutes
after turning off the vacuum pump).
6. Disconnect the charge hose from the vacuum
pump.
- Vacuum pump oil.
If the vacuum pump oil becomes dirty or deplet-
ed,replenish as needed.
7. Mount the valve caps and the service port caps.
8. Apply steps from 1 to 7 to each unit (A-unit, B-
unit) by the same method.
- 48 -
Indoor unit
Outdoor unit
Liquid side
Close
Gas side
2-Way
valve
Open
3-Way
valve
manifold gauge
Vacuum pump
Hi- handle
(CLOSE)
Low-
handle
(OPEN)
Summary of Contents for LM-2422A2L/A3L
Page 12: ... 12 900 1 225 370 2 3 LM 4822C3L LM 4822A3L ...
Page 60: ... 60 3 Display Assembly ...
Page 62: ... 62 1 2 LM 3620C2L LM 3622A2L LM 3620A2L ...
Page 63: ... 63 2 Outdoor 2 1 LM 2422C2L LM 2422A2L ...
Page 64: ... 64 2 2 LM 3625C3L A3L LM 3626A3L ...
Page 65: ... 65 2 3 LM 4822C3L LM 4822A3L ...
Page 81: ...P No 3828A20095K January 2005 Printed in Korea ...