4-10
DECK MECHANISM DISASSEMBLY
Gear Assembly P3
Gear Assembly P2
Base Assembly P2
Base Assembly P3
(A)
(B)
Chassis
Gear Assembly P2 Hole
Gear Sector Hole(A)
Plate Slider Hole(B)
Lever Spring Boss
Gear Assembly P3 Hole
Fig. A-8
29. Gear Assembly P2 (Fig. A-8-1)/
Gear Assembly P3 (Fig. A-8-2)
1) Just lift the Gear Assembly P2 up.
2) Just lift the Gear Assembly P3 up.
NOTE
When reassembling, align the two holes of the Gear
Assembly P2 and P3 in a straight line after confirmation
whether the Gear Sector Hole(A) and the Plate Slider
Hole(B) are aligned or not as Fig.
30. Base Assembly P2 (Fig. A-8-3)/
Base Assembly P3 (Fig. A-8-4)
1) Move the Base Assembly P2 in direction of arrow(A)
along the guide hole of the Chassis and disassemble it
on bottom side.
2) Move the Base Assembly P3 in direction of arrow(B)
along the guide hole of the Chassis and disassemble it
on bottom side.
(Fig. A-8-1)
(Fig. A-8-2)
(Fig. A-8-3)
(Fig. A-8-4)
Summary of Contents for KE-20P32X
Page 21: ...3 9 BLOCK DIAGRAM ...
Page 28: ...3 16 PRINTED CIRCUIT BOARD MAIN ...
Page 30: ...3 18 POWER ...
Page 31: ...3 19 CPT AV 14 AV 20 ...
Page 63: ......