- 62 -
LGE Internal Use Only
Copyright © 2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
4. TROUBLE SHOOTING
GS290 Operational Description Revision B
LG Electronics
63/136
LGE Property
4. Trouble shooting
4.1 Trouble shooting test setup
Equipment setup
Power on all of test equipment
- Connect PIF-UNION JIG or dummy battery to the DUT for power up.
- Connect mobile switch cable between Communication test set and DUT when you need to make a phone call.
- Follow trouble shooting procedure
4. TROUBLE SHOOTING