18
OUTDOOR UNIT INSTALLATION
ENGLISH
Foundation Installation
CAUTION
• Make sure to level a concrete foundation and to have good drainage.
• When installing the outdoor unit, always use a dedicated anchor bolts.
• Make sure to use anti-vibration materials (cushion pad) so that the bottom surface of the
outdoor unit can get the evenly distributed weight.
• When installing the outdoor unit at the rooftop of a building, use an anti-vibration stand.
• For ground-level installation, install an anti-vibration stand if the area is sensitive to vibra-
tion or noise.
• Insert the rubber pad of over 10 t between the concrete foundation and the anti-vibration
pad.
!
h
Refer to the foundation diagram of the approved plan(drawing) when installing.
Foundation
Anti-vibration pad
M12
foundation
bolts
Anti-vibration pad
Foundation
Model
Installation Type
A
B
C
D
E
F
G
GP*
W***
B**
Ground
installation
Anti-vibration
stand X
More
than
1,900
More
than
1,300
More
than
200
968
1,030
770
1,650
Anti-Vibration
stand O
1,590
1,134
874
1,610
Rooftop
installation
Anti-Vibration
stand O
More
than
2,000
More
than
1,600
More
than
200
1,590
1,134
874
1,610
Unit: mm
Summary of Contents for GP-W500B6C
Page 90: ...90 ENGLISH ...
Page 91: ......