16
INSTALLATION
EN
Installing the Charging
Station
Self-Standing Installation
Follow the steps below to install the charging
station on a hard and level floor.
1
Place the floor stand dock on a hard and level
floor and assemble the floor stand pipe.
2
Clip the power cord tidily into the cord keeper
a
on the back of the floor stand pipe.
3
Slide the detachable nozzle storage onto the
floor stand pipe.
• Make sure not to pinch or tangle the power
cord behind the mop pads storage.
4
Assemble the charging station onto the top of
the floor stand pipe.
5
Connect the power adapter to the port on the
back of the charging station.
6
Drill a hole in the wall and insert the drywall
anchor
b
if needed.
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
• For drywall anchor: use 1/4
″
(6.5 mm) drill bit
• For concrete or wall stud: use 1/8
″
(3 mm)
drill bit
• If screwing into drywall, use the drywall
anchor.
7
Align the wall anchoring block
c
of the
chanrging station, and fix the charging station
global_main.book.book Page 16 Monday, July 13, 2020 4:53 PM
Summary of Contents for CORDZERO A9 K
Page 3: ......
Page 45: ...Memo global_main book book Page 43 Monday July 13 2020 4 53 PM ...
Page 46: ...Memo global_main book book Page 43 Monday July 13 2020 4 53 PM ...
Page 47: ...Memo global_main book book Page 43 Monday July 13 2020 4 53 PM ...
Page 48: ......
Page 49: ......