Installation Manual
17
2
. Align th
e
ce
nt
er
of th
e
p
i
p
ing
s
and
s
uf
1. R
e
mov
e
th
e
tubing
c
ov
er
f
r
om th
e
unit b
y
loo
se
ning th
e
screw
.
fi
c
i
e
ntl
y
tight
e
n th
e
fla
re
nut b
y
hand.
3
. Finall
y
, tight
e
n th
e
fla
re
nut
w
ith to
r
qu
e
wre
n
c
h until th
e
wre
n
c
h
c
li
c
k
s
.
• Wh
e
n tight
e
ning th
e
fla
re
nut
w
ith to
r
qu
e
wre
n
c
h,
e
n
s
u
re
th
e
di
rec
tion fo
r
tight
e
ning
follo
ws
th
e
a
rr
o
w
on th
e
wre
n
c
h.
Ter
minal blo
c
k
Ov
er
5mm
C
ov
er
c
ont
r
ol
T
ubing
c
ov
er
C
onn
ec
ting
c
abl
e
O
ut
d
oor
U
n
i
t
Po
wer
c
abl
e
Outdoor unit
Liquid
s
id
e
p
i
p
ing
(Small
er
diam
e
t
er
)
Ga
s
s
id
e
p
i
p
ing
(Bigg
er
diam
e
t
er
)
T
o
r
qu
e
wre
n
c
h
Installation
O
ut
d
oor
un
i
t
ENGLISH
mm
inch
kg.m
Ø6.35
1/4
1.8
Ø9.52
3/8
4.2
Ø12.7
1/2
5.5
Ø15.88
5/8
6.6
Outside diameter
Torque
Summary of Contents for AMNW12GRBL0
Page 28: ......