6. Service Order
1. PCB Service Order
Remove Top Cover and
Control Box Cover
Remove PCB Screws (4ea)
Raise PCB and
take terminals from PCB
Take Terminals from PCB
with a tool
Replace New PCB
Hang wires up on the Rib
from Case and Insert PCB
into Control Box
Assemble C/Box and Top Cover
into a complete whole
Re-wire terminal
Tighten PCB Screws (4ea)
A2UW14GFA2 / A2UW16GFA2 / A3UW18GFA2 / A3UW21GFA2
1
4
7
2
5
8
3
6
9
Copyright © 2016 - 2020 LG Electronics Inc.
All rights reserved. Only training and service purposes.
- 175 -