
Mechanical Drawings
The Energy Monitoring Hub uses a metal enclosure that is approximately 9.25” x 8” x 2” deep. The Enclosure has a tab on
the bottom that requires 2.5” clearance. Two 1.2” holes are provided in the bottom of the Energy Monitoring Hub for
wiring purposes.
The Energy Monitoring Hub has 4 mounting holes for use with a #6 or #8 screw. The drawing above shows the relative
position of the mounting holes.
Shop for Power Metering products online at:
1.800.561.8187
www.
PowerMeterStore
.ca