
User
Guide
Rev: A, 02 03 2004,.sw3.10
Page 7
Part 1- Initial Set-up & Basic
Configuration
This section of the manual will cover the installation and basic
configuration of the NPC. There are (4) steps required to make
your NPC work:
1.
Physical Installation
2.
Set General & Network Settings
3.
Set Device Connections
4.
Create Basic Patches
Until these steps are complete, your NPC will not be operational.
For advanced configuration of the NPC, please reference Part 2 of
this guide.
Part 1 Contents
Physical Connections
8
Installation
10
System Status Check
18