Commissioning
5-1
L
BA2141 EN 1.0
5
Commissioning
5.1
First switch-on
Please do not change the switch-on sequence explained below!
Stop!
Prior to first switch-on of the controller, check the wiring for
•
Completeness
•
Short circuit
•
Earth fault
Step
Procedure
Remarks
1.
Connect the basic unit and
if available external supply for the fieldbus
module.
•
Onle of the two operating status LEDs at the controller, see
^
4-1, must be on
or blinking.
If this is not the case, see
^
7-1
•
The green Vcc display must also be on, see
^
4-1.
If this is not the case, see
^
7-1.
2.
Configuration of controllers connected to
the bus
Configure the controllers connected to the bus by means of an appropriate
configuration tool
à
e.g. LONMAKER
t
for Windows
®
, see
^
8-1
3.
It should now be possible to communicate
with the drive.
The yellow bus LED is blinking, see
^
4-1, when data is exchanged between
the 2141 fieldbus module and other controllers connected to the bus.
4.
Drive-specific settings
à
Operating Instructions of the basic unit
5.
Enable controller
à
Terminal controller inhibit (CINH) = HIGH
6.
Setpoint selection
à
The drive should be running now.
Show/Hide Bookmarks
Summary of Contents for 2141
Page 6: ...Contents iv L BA2141 EN 1 0 Show Hide Bookmarks ...
Page 14: ...Technical data 3 4 L BA2141 EN 1 0 Show Hide Bookmarks ...
Page 20: ...Installation 4 6 L BA2141 EN 1 0 Show Hide Bookmarks ...
Page 74: ...Parameter setting 6 52 L BA2141 EN 1 0 Show Hide Bookmarks ...
Page 76: ...Troubleshooting and fault elimination 7 2 L _ ONQN bk NKM Show Hide Bookmarks ...
Page 90: ...Appendix 8 14 L _ ONQN bk NKM Show Hide Bookmarks ...