Complete the following steps to install the 4S Performance to 8S Upgrade Kit:
Step 1. Make sure that the server is powered off and disconnected from power source.
Step 2. Disconnect all the external cables.
Step 3. Remove the front cover. See “Remove the front cover” in
Maintenance Manual
.
Step 4. Make sure that all the trays, including compute trays, storage tray, and the I/O tray are removed
from the server.
• For compute tray removal instructions, see
http://thinksystem.lenovofiles.com/help/topic/7X12/
.
• For storage tray removal instructions, see
http://thinksystem.lenovofiles.com/help/topic/7X12/
• For I/O tray removal instructions, see
http://thinksystem.lenovofiles.com/help/topic/7X12/remove_
Step 5. If the server is in a rack, remove it from the rack.
See the
ThinkSystem SR950 Rack Installation Instructions
, which is available here:
http://thinksystem.lenovofiles.com/help/topic/7X12/pdf_files.html
Step 6. Remove the midplanes from the server (depending on the configuration, you might need to remove
up to 6 midplanes). You
must
remove midplanes A (if installed), B, C, and D. However, you do not
need to remove the power midplane (midplane E). See “Midplane identification” in
Maintenance
Manual
for the locations of all the midplanes.
Instructions for removing the midplanes are available here:
http://thinksystem.lenovofiles.com/help/topic/7X12/remove_a_midplane.html
Note:
When you remove the top cover, discard the screws. Use the Torx-head screws that are
provided with the conversion kit instead (eight screws and an extra screw are included).
Step 7. Install the midplanes that are provided with the conversion kit. Install
only
midplane B, C, and D.
Note:
Two midplane C interconnect cards are provided in the conversion kit. Make sure to install
both of them.
Instructions for installing the midplanes are available here:
http://thinksystem.lenovofiles.com/help/topic/7X12/install_a_midplane.html
Step 8. If a filler is installed in the upper tray bay, you must remove it and install a compute tray to enable
eight-socket capability.
Complete the following steps to remove the upper tray filler and install a compute tray:
a. Remove the four screws (two each side) securing the upper tray filler.
250
ThinkSystem SR950 Setup Guide
Summary of Contents for ThinkSystem SR950
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 55: ...Figure 22 Server components Chapter 2 Server components 51 ...
Page 276: ...272 ThinkSystem SR950 Setup Guide ...
Page 282: ...278 ThinkSystem SR950 Setup Guide ...
Page 286: ...282 ThinkSystem SR950 Setup Guide ...
Page 389: ......
Page 390: ......