Figure 38. Unpacking the 5U84 Enclosure System
How to Plan and Configure Your Installation
You should become familiar with the configuration requirements of your enclosure system before you begin
installation. Refer to “How to Plan Your Installation” on page 33 for information on system configurations.
Tools Required
To install your enclosure system into an industry standard 19 inch rack cabinet, you need a flat blade
screwdriver.
Requirements for Installation of Racks
You can install the enclosure in an industry standard 19 inch cabinet capable of holding such enclosures:
• Minimum depth: 933 mm (36.73 inches) from rack posts to maximum extremity of enclosure (excludes
rear cabling).
• Weight: up to 50 kg (110 lb), dependent upon configuration, per enclosure.
• The rack should cause a maximum back pressure of 5 pascals (0.5 mm water gauge).
36
Lenovo Storage D1212/D1224/D3284Hardware Installation and Maintenance Guide
Summary of Contents for D1212
Page 6: ...iv Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 20: ...xviii Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 26: ...6 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 52: ...32 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 55: ...Figure 37 Unpacking the 2U12 and 2U24 Enclosure Systems Chapter 3 Installation 35 ...
Page 70: ...50 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 136: ...116 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 142: ...122 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 152: ...132 Lenovo Storage D1212 D1224 D3284Hardware Installation and Maintenance Guide ...
Page 153: ......
Page 154: ......