
Figure 79. Installing the server into the rack cabinet
Step 5. Secure the tray with two M6 x 16 screws to the front of the rack cabinet.
Figure 80. Securing the tray with screws
Cable the server
Attach all external cables to the server. Typically, you will need to connect the server to a power source, to
the data network, and to storage. In addition, you will need to connect the server to the management
network.
Connect to power
Connect the server to power.
98
ThinkSystem ST50 V2 Setup Guide
Summary of Contents for 7D8J
Page 1: ...ThinkSystem ST50 V2 Setup Guide Machine Types 7D8J and 7D8K ...
Page 4: ...ii ThinkSystem ST50 V2 Setup Guide ...
Page 14: ...10 ThinkSystem ST50 V2 Setup Guide ...
Page 44: ...40 ThinkSystem ST50 V2 Setup Guide ...
Page 87: ...Figure 66 Opening the memory module retaining clips Chapter 3 Server hardware setup 83 ...
Page 104: ...100 ThinkSystem ST50 V2 Setup Guide ...
Page 116: ...112 ThinkSystem ST50 V2 Setup Guide ...
Page 120: ...116 ThinkSystem ST50 V2 Setup Guide ...
Page 121: ......
Page 122: ......