![Lenovo 7D2F Maintenance Manual Download Page 122](http://html.mh-extra.com/html/lenovo/7d2f/7d2f_maintenance-manual_202595122.webp)
Figure 111. Expansion tray air baffle installation
Attention:
Air baffle is required for airflow that creates proper cooling. Make sure proper air baffles
for system configuration is installed before the power is turned on.
Step 2. Slightly slide power supply 2 out from the power supply bay (see
).
Step 3. Grip on the blue touch point on the handle of the expansion tray, and lift it up; then, lower the tray
vertically into the server with nailheads aligned to the slots on both sides.
Step 4. Rotate the handle all the way down. This connects and fix the expansion tray to the system board.
114
ThinkSystem SR850P Maintenance Manual
Summary of Contents for 7D2F
Page 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Page 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Page 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Page 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Page 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Page 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Page 187: ......
Page 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...