background image

Chapter 6. Installing optional kits

See this section to learn how to install optional kits for ThinkSystem Micro DataCenter 6U 1200mm Deep 
Rack Cabinet.

Installing the rail kits

Follow the instructions in this section to install or remove the rail kits and servers.

This cabinet supports the following servers and corresponding rail kits. Follow the instructions to install them 
into the cabinet.

•  “Install the rail kit and SE350 E1 Enclosure (1U2N)” on page 19

•  “Install the rail kit and SR250” on page 25

•  “Install the rail kit and SR670” on page 30

Install the rail kit and SE350 E1 Enclosure (1U2N)

A

Ab

bo

ou

utt tth

hiiss ttaasskk

See the following table to identify the components that come with the rail kit. 

Document

Right rail

Left rail

Two M6 screws

The cabinet supports up to 

four 

units of rail kit and SE350 E1 Enclosure and corresponding rail kit. For 

optimal use of space, it is advised to determine the location to install the rail kits based on the number of 
units that are installed. 

•  One unit: 3U

•  Two units: 3U and 4U

•  Three units: 3U, 4U, and 5U

•  Four units: 3U, 4U, 5U, and 6U

Note:

When installed vertically into this cabinet, the server can be installed with server top facing either right 

or left. In this section, however, it is illustrated with the top of server facing right as an example.

P

Prro

occeed

du

urree

Step 1.  Remove the inner rails. 

© Copyright Lenovo 2020

19

Summary of Contents for 7D2C

Page 1: ...ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide Machine Type 7D2C and 7D2P ...

Page 2: ...Lenovo 2020 LIMITED AND RESTRICTED RIGHTS NOTICE If data or software is delivered pursuant to a General Services Administration GSA contract use reproduction or disclosure is subject to restrictions set forth in Contract No GS 35F 05925 ...

Page 3: ...al rack power distribution unit 37 Installing switches 39 Installing uninterruptible power systems UPS 40 Chapter 7 Hardware removal installation and conversion 41 Removing and installing the side panels 41 Remove the side panels 41 Install the side panels 41 Removing installing and reversing the doors 42 Remove the door 42 Install the door 44 Reverse the door 45 Door position monitor device repla...

Page 4: ...ii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 5: ...ften Ennen kuin asennat tämän tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de sécurité Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installare questo prodotto leggere le Informazioni sulla Sicurezza Les sikkerhetsinformasjonen Safety Information før du installerer dette produktet Antes de instalar este produto ...

Page 6: ... verify compliance with country specific safety regulations This process ensures that the end product remains safe for the operator and service personnel under normal and foreseeable misuse conditions R002 DANGER Always lower the leveling pads on the rack cabinet Always install stabilizer brackets on the rack cabinet Always install the heaviest devices in the bottom of the rack cabinet Always inst...

Page 7: ... you are instructed otherwise in the installation and configuration procedures Connect and disconnect cables as described in the following table when installing moving or opening covers on this product or attached devices To Connect To Disconnect 1 Turn OFF all power sources and equipment that is to be attached to this product 2 Attach signal cables to the product 3 Attach power cords to the produ...

Page 8: ... cord Be sure to disconnect all power cords in the rack cabinet before you service any device in the rack cabinet Install an emergency power off switch if more than one power device power distribution unit or uninterruptible power supply is installed in the same rack cabinet Connect all devices that are installed in a rack cabinet to power devices that are installed in the same rack cabinet Do not...

Page 9: ...Make sure that the route that you choose can support the weight of the loaded rack cabinet See the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet Make sure that all door openings are at least 760 x 2030 mm 30 x 80 in Make sure that all devices shelves drawers doors and cables are secure Make sure that the four leveling pads are raised to their highest posit...

Page 10: ...viii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 11: ...aCenter 1200mm Deep Rack Cabinet is a 6U cabinet designed for Micro DataCenter servers Figure 1 ThinkSystem Micro DataCenter 1200mm Deep Rack Cabinet The cabinet comes with a limited warranty For details about the warranty see https support lenovo com us en solutions ht503310 For details about your specific warranty see http datacentersupport lenovo com warrantylookup Copyright Lenovo 2020 1 ...

Page 12: ...2 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 13: ...rted by the rack cabinet This rack cabinet supports the following servers SR250 up to four units with Toolless Friction Rail v2 See https thinksystem lenovofiles com help topic 7Y51 pdf_files html for more information SE350 E1 Enclosure 1U 2 node up to four units of E1 enclosures with Toolless Friction Rail v2 See https thinksystem lenovofiles com help topic SE350 pdf_files html for more informati...

Page 14: ...4 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 15: ...inet components 1 Rack cabinet frame 5 Shipping bracket 2 Wheeled trays 6 Removable and reversible door 3 Removable side panel 7 Key 4 Hardware box see Hardware box on page 5 8 Removable side panel Hardware box Figure 3 Components in the hardware box Copyright Lenovo 2020 5 ...

Page 16: ...ox 1 20 M6 screws 5 One socket wrench 2 16 flange nuts 6 One spud socket wrench 3 20 G type cage nuts 7 15 cable ties 4 One combination wrench 8 Two bolt down brackets 6 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 17: ...on Tip hazard Important The task in this section requires more than two people The cabinet could be easily tipped Move it with extreme caution WARNING Failure to follow these instructions could result in equipment damage severe injuries or death Before moving the rack cabinet complete the following steps 1 Unlock and open both doors by pulling up the handle and turning it clockwise Copyright Lenov...

Page 18: ...gure 4 Opening the door 2 Remove the four shipping brackets that secure the cabinet to the pallet Figure 5 Removing shipping brackets 8 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 19: ...g feet are all up If not complete the following procedure on each of the leveling feet a Loosen the nut that fixes the leveling foot Figure 6 Loosening the nut b Insert the open end of the combination wrench in the hardware box see 4 in Hardware box on page 5 into the screw above the leveling foot and turn it counterclockwise until it no longer makes contact with the floor Note Make sure to shorte...

Page 20: ... the rear until it reaches the designated site Figure 8 Sliding the cabinet down from the pallet Notes Make sure that more than two people are handling the cabinet while sliding it down from the ramp board Do not stand in the path of the cabinet Crane lifter 10 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 21: ...the cabinet Step 3 Connect the four eye bolts to the hook of a crane lifter and make sure the cord length allows an angle more than 75 Step 4 Lift the cabinet and place it to the designated site After moving the cabinet to the designated site complete the following steps 1 Make sure the leveling feet are down and make firm contact to the ground If not complete the following procedure on each of th...

Page 22: ... on page 5 into the hexagonal head of the foot and turn it clockwise until the foot makes firm contact with the floor Figure 11 Adjusting the rack cabinet foot c Once the leveling foot makes firm contact with the floor tighten the nut that fixes it 12 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 23: ...t 2 To secure the cabinet to the ground you can install the bolt down brackets that is included in the hardware box see 8 in Hardware box on page 5 Figure 13 Installing the bolt down brackets Chapter 4 Moving the rack cabinet 13 ...

Page 24: ...14 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 25: ...he roof holes as illustrated If necessary secure the cables with the straps that come in the hardware bag Grounding cable See this section to learn how to connect ground cable in the rack cabinet The following grounding pins close to door frame bottom are available for grounding cable connection Grounding cable from the cabinet frame This cable is required for grounding Copyright Lenovo 2020 15 ...

Page 26: ...Figure 15 Grounding cable from the cabinet frame Grounding cable from the cabinet door This is an optional grounding cable 16 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 27: ...Figure 16 Grounding cable from the cabinet door Grounding cable from the side panel This is an optional grounding cable Chapter 5 Managing cables 17 ...

Page 28: ...Figure 17 Grounding cable from the side panel 18 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 29: ... Ab bo ou ut t t th hiis s t ta as sk k See the following table to identify the components that come with the rail kit 1 Document 3 Right rail 2 Left rail 4 Two M6 screws The cabinet supports up to four units of rail kit and SE350 E1 Enclosure and corresponding rail kit For optimal use of space it is advised to determine the location to install the rail kits based on the number of units that are i...

Page 30: ...e release latch becomes visible Press on the release latch Remove the inner rail from the outer rail Step 2 Install the inner rails to the enclosure Figure 19 Installing the inner rails to the enclosure 20 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 31: ...tep 4 Install the rear mounting bracket of the right outer rail to the lower EIA flange Figure 20 Installing the rear mounting bracket to the EIA flange Align the rear pins on the outer rails to the EIA flange Slightly push the end of the rail down to hook the rear mounting bracket latch to the rack Push the rail into the EIA flange until the pins protrude through into the corresponding holes in t...

Page 32: ...ous two steps to install the left outer rail to the upper EIA flange Step 7 Optional If you need to ship the rack cabinet with the enclosures installed or place the rack cabinet in a vibration prone area install two M6 screws into the mounting flanges between the two rear pins on both sides Figure 22 Installing the rear screws Step 8 Rotate the E1 enclosure clockwise so that the right side is faci...

Page 33: ...Figure 23 Rotating SE350 E1 Enclosure Step 9 Install the E1 Enclosure into the rack Figure 24 Slide the E1 Enclosure into the rails in the rack Chapter 6 Installing optional kits 23 ...

Page 34: ...ess the release latches Push the enclosure all the way into the rack until it clicks into locked position Step 10 Optional Open the rack release latches and tighten the screws to firmly secure the rail before moving or placing the rack cabinet in a vibration prone area Figure 25 Securing the enclosure 1 Rack release latches 2 Front screw Remove SE350 E1 enclosure from the rack 24 ThinkSystem Micro...

Page 35: ...re Install the rail kit and SR250 A Ab bo ou ut t t th hiis s t ta as sk k See the following table to identify the components that come with the rail kit 1 Document 3 Right rail 2 Left rail 4 Two M6 screws The cabinet supports up to four units of rail kit and SE350 E1 Enclosure and corresponding rail kit For optimal use of space it is advised to determine the location to install the rail kits base...

Page 36: ...and 6U Note When installed vertically into this cabinet the server can be installed with server top facing either right or left In this section however it is illustrated with the top of server facing left as an example P Pr ro oc ce ed du ur re e Step 1 Remove the inner rails Figure 27 Removing the inner rails Pull the inner rail outward until the release latch becomes visible Press on the release...

Page 37: ... server Push the inner rail as shown until the mounting pins on the server lock into place with the inner rail Note Make sure the stamp Front always faces toward the front when assembling the inner rail to the server Step 3 Rotate the server counter clockwise so that the left side is facing down Figure 29 Rotating SR250 Chapter 6 Installing optional kits 27 ...

Page 38: ...e corresponding holes in the rack The bracket will lock into place as illustrated Step 5 Install the front mounting bracket of the right outer rail to the lower mounting flange Figure 31 Installing the front mounting bracket to the EIA flange Note Make sure the rail stays horizontal Open the front bracket and align the front end of the outer rail to the EIA flange Pull the outer rail into the EIA ...

Page 39: ... Step 8 Slide the SR250 into the rack Figure 33 Slide the SR250 into the rack Note Make sure the top of the enclosure is facing right Lift and align the server to the slide rails Position the enclosure as shown and slide it into the rack Press the release latches Push the enclosure all the way into the rack until it clicks into locked position Step 9 Optional Open the rack release latches and tigh...

Page 40: ...SR250 Disconnect all the cables that are connected to the server and slide the server out until it stops Press the release latches to disengage the inner rails Remove the server Install the rail kit and SR670 A Ab bo ou ut t t th hiis s t ta as sk k 30 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 41: ...entation Two people are required for this task When installing SR670 in the rack cabinet do not mix it with SE350 or SR250 in the same cabinet See the following table to identify the components that come with the mounting kit 1 Two C channels 4 Four black M3 5 x 5 mm flat head screws with pre applied threadlocking adhesive 2 One left mounting glide 5 Ten black M5 x 20 mm combination head screws 3 ...

Page 42: ... not fully remove the rack mounting brackets as they are required to secure the server into the vertical rack Step 2 Secure the mounting glides to the server Figure 37 Securing the mounting glides 32 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 43: ... C channel in the lower portion of the rack cabinet Figure 38 Installing the lower C channel Align the C channel between the lower rack EIA flanges Secure the front end of the C channel to the front EIA flange with one M5 x 20 mm screw through the left most hole in the channel Secure the rear end of the C channel to the rear EIA flange with two M5 x 20 mm screws through the right and left most hol...

Page 44: ...w through the left most hole in the channel Secure the rear end of the C channel to the rear EIA flange with two M5 x 20 mm screws through the right and left most holes in the bracket Do NOT over tighten the screws as the rack EIA flange could be deformed Step 5 Rotate the server 90 degree clockwise so that the right side is facing down 34 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet U...

Page 45: ...ver Step 6 Lift the server with two people and slide it into the C channels Figure 41 Installing the server into the rack cabinet Step 7 Tighten both the upper and lower captive thumb screws Chapter 6 Installing optional kits 35 ...

Page 46: ...Figure 42 Securing the rack mounting brackets Step 8 Secure each rack mounting bracket with two M5 x 20 mm screws 36 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 47: ...power distribution unit Follow the instructions in this section to install the DPI universal rack power distribution unit A Ab bo ou ut t t th hiis s t ta as sk k See the following table to identify the components that come with the rail kit Chapter 6 Installing optional kits 37 ...

Page 48: ...it 3 One 1U blank filler panel P Pr ro oc ce ed du ur re e Step 1 Secure the power distribution unit to one side of the horizontal mounting plate with two screws Figure 44 Securing the power distribution unit Step 2 Install the bracket to the rack 38 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 49: ...binet This rack cabinet supports the following switches See the corresponding links for installation instructions https systemx lenovofiles com help topic com lenovo thinksystem ne0152t doc ts_ne0152t html https systemx lenovofiles com help topic com lenovo thinksystem ne1032t doc ts_ne1032t html https systemx lenovofiles com help topic com lenovo thinksystem ne2572 doc ts_ne2572 html https system...

Page 50: ...ninterruptible power systems UPS See this section to learn how to install uninterruptible power systems UPS Following the instructions in the following link to do removal installation or to update compatible software for 5P1500R L 120V and 5P1550GR L 230V https www eaton com us en us catalog backup power ups surge it power distribution eaton 5p ups resources html 40 ThinkSystem Micro DataCenter 6U...

Page 51: ...he key that comes with the rack cabinet into the key hole on the side panel and turn it counterclockwise to unlock the panel Figure 47 Removing the side panel Step 3 Press on the latch on both sides of the panel at the same time to release the side panel Step 4 Pivot the top of the panel away from the cabinet frame to remove it Install the side panels Complete the following steps to install the si...

Page 52: ...erse the doors Remove the door Follow the instructions in this section to remove the cabinet door A Ab bo ou ut t t th hiis s t ta as sk k Note For safety this task must be done by two people P Pr ro oc ce ed du ur re e 1 If necessary insert the key and turn it clockwise to unlock the door 2 Pull the lower end of the handle up and clockwise then open the door 42 ThinkSystem Micro DataCenter 6U 120...

Page 53: ...e er r t th hiis s t ta as sk k iis s c co om mp plle et te ed d Step 1 Pull up and hold both of the hinge shafts to disengage the door from the cabinet frame then remove the door Chapter 7 Hardware removal installation and conversion 43 ...

Page 54: ...sk k Note For safety this task must be done by two people P Pr ro oc ce ed du ur re e Step 1 Align the door to the frame hinges and push the shafts in to secure the door to the frame Figure 51 Installing the door 44 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 55: ...turn it counterclockwise to lock the door Reverse the door Both the doors of this cabinet are reversible Follow the instructions in this section to reverse the cabinet door Note For safety this task must be done by two people 1 If necessary insert the key and turn it clockwise to unlock the door 2 Pull the lower end of the handle up and clockwise then open the door Chapter 7 Hardware removal insta...

Page 56: ...he door P Pr ro oc ce ed du ur re e Step 1 Pull up and hold both of the hinge shafts to disengage the door from the cabinet frame then remove the door 46 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 57: ...move the screws that secure the hinges to the cabinet frame Step 3 Rotate both hinges 180 degree switch the top and bottom hinges then install them to the opposite side of the frame Chapter 7 Hardware removal installation and conversion 47 ...

Page 58: ... to remove and reinstall the devices a Remove the two screws that secure the door position monitor device to the cabinet frame Figure 56 Removing the door position monitor device b Install the device to the equivalent location on the opposite side on the cabinet frame 48 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 59: ...pposite side of the door Figure 58 Removing and installing the door position monitor device Step 5 Remove the screws that secure the handle to the door then rotate the door 180 degree while keeping the handle in the original orientation and secure the handle to the door with screws Chapter 7 Hardware removal installation and conversion 49 ...

Page 60: ...ure 59 Installing the handle brackets Step 6 Align the door to the frame hinges and push the shafts in to secure the door to the frame 50 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 61: ... te er r t th hiis s t ta as sk k iis s c co om mp plle et te ed d 1 Close the cabinet door and turn the door handle counterclockwise to secure it Figure 61 Closing the cabinet door Chapter 7 Hardware removal installation and conversion 51 ...

Page 62: ...nitor devices 1 Electronics lock 2 Door position monitor magnet and switch 3 Environmental monitoring appliance In this case contact the following for technical support and service with these devices Phone number 86 400 810 1315 English Chinese Service hours UTC 8 Monday Friday 08 15 18 00 Saturday 09 00 17 00 E mail address itbtech support schneider electric com Service website https www schneide...

Page 63: ...2 P Pr ro oc ce ed du ur re e Step 1 Remove the two screws that secure the door position monitor device to the cabinet frame Figure 63 Removing door position monitor device Install the door position monitor device P Pr ro oc ce ed du ur re e Step 1 Secure the device to the cabinet frame with two screws Figure 64 Installing the door position monitor device A Af ft te er r t th hiis s t ta as sk k i...

Page 64: ...turn the door handle counterclockwise to secure it Figure 65 Closing the cabinet door b If necessary insert the key and turn it counterclockwise to lock the door 54 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 65: ...stem products at the following location http thinksystem lenovofiles com help index jsp You can take these steps to try to solve the problem yourself Check all cables to make sure that they are connected Check the power switches to make sure that the system and any optional devices are turned on Check for updated software firmware and operating system device drivers for your Lenovo product The Len...

Page 66: ...ware levels Other pertinent information such as error messages and logs As an alternative to calling Lenovo Support you can go to https www 947 ibm com support servicerequest Home action to submit an Electronic Service Request Submitting an Electronic Service Request will start the process of determining a solution to your problem by making the pertinent information available to the service techni...

Page 67: ...n new editions of the publication Lenovo may make improvements and or changes in the product s and or the program s described in this publication at any time without notice The products described in this document are not intended for use in implantation or other life support applications where malfunction may result in injury or death to persons The information contained in this document does not ...

Page 68: ...el and Intel Xeon are trademarks of Intel Corporation in the United States other countries or both Internet Explorer Microsoft and Windows are trademarks of the Microsoft group of companies Linux is a registered trademark of Linus Torvalds Other company product or service names may be trademarks or service marks of others 58 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 69: ...P parts listing 5 power distribution units 37 R rack cabinet 7 rail kit 19 remove door position monitor device 53 reverse 45 S safety iii safety statement iv service and support before you call 55 hardware 56 software 56 software service and support telephone numbers 56 specifications 3 support web page custom 55 T telephone numbers 56 ThinkSystem Micro DataCenter iv ThinkSystem Micro DataCenter 6...

Page 70: ...60 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...

Page 71: ......

Page 72: ...Part Number SP47A41857 Printed in China 1P P N SP47A41857 1PSP47A41857 ...

Reviews: