STEP 4 -- REFRIGERANT PIPING -- Removing Existing Indoor Metering Device

SENSING

LINE

TEFLON

®

 RING

FIXED ORIFICE

BRASS NUT

LIQUID LINE ASSEMBLY

(INCLUDES STRAINER)

LIQUID LINE ORIFICE HOUSING

DISTRIBUTOR TUBES

DISTRIBUTOR

ASSEMBLY

REMOVE AND DISCARD

WHITE TEFLON

®

 SEAL

(IF PRESENT)

1. On fully cased coils, remove the coil access and plumbing panels.

2. Remove any shipping clamps from the liquid line and distributor as­

sembly.

3. Using two wrenches, disconnect liquid line from liquid line orifice hous­

ing. Take care not to twist or damage distributor tubes during this pro­
cess.

4. Remove and discard fixed orifice, valve stem assembly (if present)

and Teflon

®

 washer as illustrated above.

5. Use a field-provided fitting to temporarily reconnect the liquid line to the

indoor unit's liquid line orifice housing.

TYPICAL EXISTING FIXED ORIFICE
REMOVAL PROCEDURE 
(UNCASED COIL SHOWN)

TYPICAL EXISTING EXPANSION VALVE REMOVAL
PROCEDURE (UNCASED COIL SHOWN)

TWO-PIECE PATCH PLATE

(UNCASED COIL ONLY)

VAPOR

LINE

DISTRIBUTOR

ASSEMBLY

DISTRIBUTOR

TUBES

LIQUID

LINE

MALE EQUALIZER

LINE FITTING

EQUALIZER
LINE

EXPANSION

VALVE

TEFLON®
RING

STUB END

TEFLON

®

RING

SENSING BULB

LIQUID LINE

ORIFICE

HOUSING

LIQUID LINE

ASSEMBLY WITH

BRASS NUT

1. On fully cased coils, remove the coil access and plumbing panels.

2. Remove any shipping clamps from the liquid line and distributor

assembly.

3. Disconnect the equalizer line from the expansion valve equalizer

line fitting on the vapor line.

4. Remove the vapor line sensing bulb.

5. Disconnect the liquid line from the expansion valve at the liquid line

assembly.

6. Disconnect the expansion valve from the liquid line orifice housing.

Take care not to twist or damage distributor tubes during this
process.

7. Remove and discard expansion valve and the two Teflon

®

 rings.

8. Use a field-provided fitting to temporarily reconnect the liquid line to

the indoor unit's liquid line orifice housing.

LOW

HIGH

EXISTING

INDOOR

UNIT

GAUGE

MANIFOLD

CYLINDER CONTAINING
CLEAN HCFC-22* TO BE
USED FOR FLUSHING
(Positioned to deliver liquid
refrigerant)

LIQUID LINE SERVICE

VALVE

INLET

DISCHARGE

TANK
RETURN

CLOSED

OPENED

RECOVERY

CYLINDER

RECOVERY MACHINE

NEW

OUTDOOR

UNIT

VAPOR LINE

SERVICE VALVE

V

APOR

LIQUID

1

CONNECT GAUGES AND EQUIPMENT FOR
FLUSHING PROCEDURE

A

B

C

D

B

OR

FLUSHING LINE SET

1. Set the recovery machine for liquid recovery and start the recovery

machine. Open the gauge set valves to allow the recovery
machine to pull a vacuum on the existing system line set and indoor
unit coil.

2. Position the cylinder of clean HCFC-22* for delivery of liquid

refrigerant and open its valve to allow liquid refrigerant to flow into
the system through the vapor line valve. Allow the refrigerant to
pass from the cylinder and through the line set and the indoor unit
coil before it enters the recovery machine.

3. After all of the liquid refrigerant has been recovered, switch the

recovery machine to vapor recovery so that all of the HCFC-22
vapor is recovered. Allow the recovery machine to pull the system
down to 0.

4. Close the valve on the inverted HCFC-22 cylinder and the gauge

set valves. Pump the remaining refrigerant out of the recovery
machine and turn the machine off.

The line set and indoor unit coil must be flushed with at least the same
amount of clean refrigerant* that previously charged the system.
Check the charge in the flushing cylinder before proceeding.

1A

2

3

1B

*IMPORTANT - Clean refrigerant is any refrigerant in a system that has not had compressor burn out. If the system
has experienced burn out, it is recommended that the existing line set and indoor coil be replaced.

A.

HCFC-22 cylinder with clean refrigerant* (positioned to deliver liquid
refrigerant) to the vapor service valve.

B.

HCFC-22 gauge set (low side) to the liquid line valve.

C.

HCFC-22 gauge set center port to inlet on the recovery machine with an
empty recovery tank connected to the gauge set.

D.

Connect recovery tank to recovery machine per machine instructions.

FIGURE 11

Summary of Contents for XC21-024

Page 1: ...RUCTIONS Dave Lennox Signature Collection SL18XC1 System AIR CONDITIONERS 507353 01 7 2018 WARNING Improper installation adjustment alteration service or maintenance can cause property damage personal...

Page 2: ...subject to damage e g being bent or scratched While handling or stowing the panels consider any weather conditions especially wind that may cause panels to be blown around and damaged CAUTION As with...

Page 3: ...e and uneven surfaces Concrete slab use two plastic anchors hole drill 1 4 COIL BASE PAN CORNER POST STABILIZING BRACKET 18 GAUGE METAL 2 WIDTH HEIGHT AS REQUIRED 10 X 1 2 LONG SELF DRILLING SHEET MET...

Page 4: ...erforming any service procedure to neutralize electrostatic charge NOTE For proper voltages select control wires gauge per table below WIRE RUN LENGTH AWG INSULATION TYPE LESS THAN 100 30 METERS 18 TE...

Page 5: ...ontinued Outdoor Control A175 Jumpers and Terminals 55 50 DEGREE TARGET 45 DEGREE TARGET 40 DEGREE TARGET DEFAULT 55 50 45 40 55 50 45 40 55 50 45 40 55 50 45 40 DEGREE TARGET 30 0 30 SECOND DELAY SEC...

Page 6: ...o stage electric heat cut factory installed metal link between W1 and W2 Then connect thermostat wire between the air handler control s W2 and the thermostat s W2 terminal 5 Cut on board link clippabl...

Page 7: ...existing traps Polyol es ter POE oils are used in Lennox units charged with HFC 410A refrigerant Residual mineral oil can act as an insulator preventing proper heat transfer It can also clog the expa...

Page 8: ...line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD CYLINDER CONTAINING CLEAN HCFC 22 TO BE USED FOR FLUSHING Positioned to deliver liquid refrigerant LIQUID LINE SERVICE VALVE INLET DIS...

Page 9: ...ort nitrogen flow will have an exit point NITROGEN HIGH LOW B A C PIPING PANEL REMOVAL PREPARING LINE SET CAP AND CORE REMOVAL Remove piping panel to access service valves Cut ends of the refrigerant...

Page 10: ...ter saturated cloths under the valve body to protect the base paint 4FLOW NITROGEN Flow regulated nitrogen at 1 to 2 psig through the refrigeration gauge set into the valve stem port connection on the...

Page 11: ...SION VALVE KIT MATCH UPS AND APPLICATION INFORMATION 1 REMOVE THE FIELD PROVIDED FITTING THAT TEMPORARILY RECON NECTED THE LIQUID LINE TO THE INDOOR UNIT S DISTRIBUTOR ASSEM BLY 2 INSTALL ONE OF THE P...

Page 12: ...linder of HFC 410A refrigerant to the center port of the manifold gauge set Open the valve on the HFC 410A cylinder vapor only B Open the high pressure side of the manifold to allow HFC 410A into the...

Page 13: ...IGH LOW NITROGEN CONNECT GAUGE SET A B C D LINE SET AND INDOOR COIL NOTE Remove cores from service valves if not already done FIGURE 16 EVACUATE LINE SET AND INDOOR COIL The unit is shipped with a fac...

Page 14: ...rigerant Open the mani fold gauge valve 1 to 2 psig in order to release the vac uum in the line set and indoor unit 9 Perform the following S Close manifold gauge valves S Shut off HFC 410A cylinder S...

Page 15: ...and clean as neces sary 4 Inspect the condition of refrigerant piping and confirm that pipes are not rubbing copper to copper Also check the condition of the insulation on the refrigerant lines Repair...

Page 16: ...Up and Performance Checklist Customer Address Indoor Unit Model Serial Outdoor Unit Model Serial Solar Module Mfg and Model Serial Notes START UP CHECKS Refrigerant Type Rated Load Amps Actual Amps Ra...

Reviews: