background image

Page 3

SL18XC1 SERIES

INSTALL UNIT AWAY

FROM WINDOWS

TWO 90

_

 ELBOWS INSTALLED IN LINE SET

WILL REDUCE LINE SET VIBRATION

PLACEMENT

FIGURE 2

Install unit level or, if on a slope, maintain slope tolerance of 2
degrees (or 2 inches per 5 feet [50 mm per 1.5 m]) away from
building structure.

GROUND LEVEL

MOUNTING
SLAB

BUILDING

STRUCTURE

DISCHARGE AIR

SLAB MOUNTING

FIGURE 3

LEG DETAIL

BASE

2” (50.8MM) SCH 40

FEMALE THREADED

ADAPTER

ELEVATED SLAB MOUNTING USING FEET

EXTENDERS

2” (50.8MM)
SCH 40 MALE
THREADED
ADAPTER

Use additional 2” SCH 40 male
threaded adapters which can
be threaded into the female
threaded adapters to make
additional adjustments to the
level of the unit.

FIGURE 4

Unit Stabilizer Bracket (field-provided):

Always use stabilizers when unit is raised above
the factory height. 
(Elevated units could become unstable in gusty
wind conditions.)
Stabilizers may be used on any unit installed on
unstable and uneven surfaces.

Concrete slab

 — use two

plastic anchors (hole drill 1/4”)

COIL

BASE PAN

CORNER POST

STABILIZING BRACKET

(18 GAUGE METAL — 2”

WIDTH; HEIGHT AS

REQUIRED)

#10 X 1/2” LONG

SELF-DRILLING

SHEET METAL

SCREWS

#10 X 1-1/4” LONG

HEX HD SCREW AND

FLAT WASHER

STABILIZING UNIT ON UNEVEN SURFACES

IMPORTANT !

Slab Mounting

Deck Top  Mounting

Stabilizing bracket - 18 gauge metal. 
2” (50.8mm) width; height as required. 
Bent to form right angle as shown.

SAME FASTENERS AS
SLAB SIDE MOUNTING.

MINIMUM ONE

PER SIDE

FOR EXTRA

STABILITY

Install one bracket per side (minimum). For extra stability, install
two brackets per side, two inches (51mm) from each corner.

FIGURE 5

STEP 2 -- ELECTRICAL -- Circuit Sizing
and Wire Routing

In the U.S.A., wiring must conform with current local codes
and the current National Electric Code (NEC). In Canada,
wiring must conform with current local codes and the current
Canadian Electrical Code (CEC).

Refer to the furnace or air handler installation instructions
for additional wiring application diagrams and refer to unit
nameplate for minimum circuit ampacity and maximum
overcurrent protection size.

Summary of Contents for XC21-024

Page 1: ...RUCTIONS Dave Lennox Signature Collection SL18XC1 System AIR CONDITIONERS 507353 01 7 2018 WARNING Improper installation adjustment alteration service or maintenance can cause property damage personal...

Page 2: ...subject to damage e g being bent or scratched While handling or stowing the panels consider any weather conditions especially wind that may cause panels to be blown around and damaged CAUTION As with...

Page 3: ...e and uneven surfaces Concrete slab use two plastic anchors hole drill 1 4 COIL BASE PAN CORNER POST STABILIZING BRACKET 18 GAUGE METAL 2 WIDTH HEIGHT AS REQUIRED 10 X 1 2 LONG SELF DRILLING SHEET MET...

Page 4: ...erforming any service procedure to neutralize electrostatic charge NOTE For proper voltages select control wires gauge per table below WIRE RUN LENGTH AWG INSULATION TYPE LESS THAN 100 30 METERS 18 TE...

Page 5: ...ontinued Outdoor Control A175 Jumpers and Terminals 55 50 DEGREE TARGET 45 DEGREE TARGET 40 DEGREE TARGET DEFAULT 55 50 45 40 55 50 45 40 55 50 45 40 55 50 45 40 DEGREE TARGET 30 0 30 SECOND DELAY SEC...

Page 6: ...o stage electric heat cut factory installed metal link between W1 and W2 Then connect thermostat wire between the air handler control s W2 and the thermostat s W2 terminal 5 Cut on board link clippabl...

Page 7: ...existing traps Polyol es ter POE oils are used in Lennox units charged with HFC 410A refrigerant Residual mineral oil can act as an insulator preventing proper heat transfer It can also clog the expa...

Page 8: ...line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD CYLINDER CONTAINING CLEAN HCFC 22 TO BE USED FOR FLUSHING Positioned to deliver liquid refrigerant LIQUID LINE SERVICE VALVE INLET DIS...

Page 9: ...ort nitrogen flow will have an exit point NITROGEN HIGH LOW B A C PIPING PANEL REMOVAL PREPARING LINE SET CAP AND CORE REMOVAL Remove piping panel to access service valves Cut ends of the refrigerant...

Page 10: ...ter saturated cloths under the valve body to protect the base paint 4FLOW NITROGEN Flow regulated nitrogen at 1 to 2 psig through the refrigeration gauge set into the valve stem port connection on the...

Page 11: ...SION VALVE KIT MATCH UPS AND APPLICATION INFORMATION 1 REMOVE THE FIELD PROVIDED FITTING THAT TEMPORARILY RECON NECTED THE LIQUID LINE TO THE INDOOR UNIT S DISTRIBUTOR ASSEM BLY 2 INSTALL ONE OF THE P...

Page 12: ...linder of HFC 410A refrigerant to the center port of the manifold gauge set Open the valve on the HFC 410A cylinder vapor only B Open the high pressure side of the manifold to allow HFC 410A into the...

Page 13: ...IGH LOW NITROGEN CONNECT GAUGE SET A B C D LINE SET AND INDOOR COIL NOTE Remove cores from service valves if not already done FIGURE 16 EVACUATE LINE SET AND INDOOR COIL The unit is shipped with a fac...

Page 14: ...rigerant Open the mani fold gauge valve 1 to 2 psig in order to release the vac uum in the line set and indoor unit 9 Perform the following S Close manifold gauge valves S Shut off HFC 410A cylinder S...

Page 15: ...and clean as neces sary 4 Inspect the condition of refrigerant piping and confirm that pipes are not rubbing copper to copper Also check the condition of the insulation on the refrigerant lines Repair...

Page 16: ...Up and Performance Checklist Customer Address Indoor Unit Model Serial Outdoor Unit Model Serial Solar Module Mfg and Model Serial Notes START UP CHECKS Refrigerant Type Rated Load Amps Actual Amps Ra...

Reviews: