11
13.
Reinstall the EEV motor.
14. Route wiring harness through coil, past the blower
and into the electrical box. Do not pinch or bind wires.
Figure 9. Coil Rotated 180°
Figure 10. Secure Wire Harness with Clip
15. Relocate T-1 Sensor to be downstream of the coil to
sense room air temperature.
16. Secure T-1 sensor to top of coil. See Figure 10.
17. Re-secure the wiring harness using clips and wire
ties. Do not pinch or bind wires.
18. Reconnect the T2 and T2B sensors.
19. Reconnect the wire harness plug inside of electrical
control box.
Figure 12. Relocate T-1 Sensor
20. Turn the coil compartment cover 180° and reattach to
the unit cabinet.
Figure 11. Route Wiring Harness Through Coil and
Into Electrical Compartment
21. Reattach the blower compartment panel.