Page 37
TABLE 22
OUTDOOR TERMINATION KITS USAGE*
Input Size
Vent
Pipe
Dia. in.
STANDARD KITS
CONCENTRIC KITS
Flush
Mount
Kit
Wall Kit
Wall Ring Kit
Field
Fabricated
1-1/2 inch
2 inch
3 inch
2 inch
3 inch
2 inch
51W11
(US)
51W12
(CA)
22G44 (US)
4
30G28 (CA)
44J40
(US)
4
81J20 (CA)
15F74
71M80
(US)
4
44W92
(CA)
69M29
(US)
4
44W92
(CA)
60L46 (US)
4
44W93 (CA)
070
2
3
YES
YES
1
YES
1
YES
5
YES
2
YES
2-1/2
3
YES
YES
1
YES
1
YES
5
YES
2
YES
3
3
YES
YES
1
YES
1
YES
5
YES
2
YES
090
2
3
YES
YES
YES
5
YES
YES
YES
2-1/2
3
YES
YES
YES
5
YES
YES
YES
3
3
YES
YES
YES
5
YES
YES
YES
110
2
YES
YES
YES
5
YES
YES
YES
2-1/2
YES
YES
5
YES
YES
YES
3
YES
YES
5
YES
YES
YES
* Kits must be properly installed according to kit instructions.
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in total vent length calcula
tions. See vent length tables.
1
Requires field-provided outdoor 1-1/2” exhaust accelerator.
2
Concentric kits 71M80 and 44W92 include 1-1/2” outdoor accelerator, when used with 045 and 070 input models.
3
Flush mount kits 51W11 and 51W12 include 1-1/2 in. outdoor exhaust accelerator, required when used with 045, 070 and 090 input models.
4
Termination kits 30G28, 44W92, 4493 and 81J20 are certified to ULC S636 for use in Canada only.
5
See table 27 for vent accelerator requirements.
Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
NOTE
- A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or
self tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system
check. Allow fumes to dissipate for at least 5 minutes
before placing unit into operation.
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any ridges or
rough edges. If end is not chamfered, edge of pipe may
remove cement from fitting socket and result in a leak
ing joint.
3 - Clean and dry surfaces to be joined.
NOTE -
Check the inside of vent pipe thoroughly for any
obstruction that may alter furnace operation.
4 - Test fit joint and mark depth of fitting on outside of pipe.
5 - Uniformly apply a liberal coat of PVC primer for PVC or
use a clean dry cloth for ABS to clean inside socket sur
face of fitting and male end of pipe to depth of fitting
socket.
6 - Promptly apply solvent cement to end of pipe and in
side socket surface of fitting. Cement should be ap
plied lightly but uniformly to inside of socket. Take care
to keep excess cement out of socket. Apply second
coat to end of pipe.
NOTE
- Time is critical at this stage. Do not allow prim
er to dry before applying cement.
7 - Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn dur
ing assembly (but not after pipe is fully inserted) to dis
tribute cement evenly. DO NOT turn ABS or cellular
core pipe.
NOTE
- Assembly should be completed within 20 sec
onds after last application of cement. Hammer blows
should not be used when inserting pipe.
8 - After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a bead
around its entire perimeter. Any gaps may indicate a
defective assembly due to insufficient solvent.
9 - Handle joints carefully until completely set.