IOM / MINIAIR-0507
35
S
E
CTION
15
–
P
RE
-S
TART
C
HECKLIST
6.1 Checks prior to initial start-up
Before turning on the apparatus verify the following:
1. Fixing of unit to ceiling;
2. Connection of ducts;
3. Correct condensation run-off;
4. Connection of mains supply;
5. Closing of all electrical clamps.
S
ECTION
16
–
S
TANDARD
M
AINTENANCE
It is the responsibility of the user to carry out all types of maintenance operations.
Only personnel previously trained and qualified may carry out maintenance operations.
Should the apparatus require disassembly, hand protection is required
16.1 Monthly maintenance
16.1.1 Filter section checklist
Possibility for inspection to replace filters from below
1
and laterally
2
BEFORE FOLLOWING ANY TYPE OF
MAINTENANCE OPERATION, BE CERTAIN THAT
THE APPARATUS MAY NOT CASUALLY OR
ACCIDENTALLY BE CONNECTED TO THE
ELECTRICAL MAINS SUPPLY. THERFORE IT IS
NECESSARY TO SHUTDOWN
THE UNIT’S
POWER SUPPLYAD PRIOR TO MAINTENANCE.