![Lennox 70LENX1000 Manual Download Page 95](http://html1.mh-extra.com/html/lennox/70lenx1000/70lenx1000_manual_1877998095.webp)
Gas heat exchanger unit – maintenance plan
4. Check the Venturi pipe / clean it if necessary
Remove any dirt at the mouth of the Venturi pipe with a brush.
Be careful to not let it fall inside the piece.
6. Check electrodes / clean it.
Use fine sandpaper to clean the electrode core
5. Check burner head / clean it if necessary.
Remove any dirt from perforated surface with a brush. Check the
condition of the head.
Summary of Contents for 70LENX1000
Page 9: ...Burner units model E Baltic C D E box Smart Energy Company www systemapolska pl ...
Page 10: ...Burner units model E Baltic F G H box Smart Energy Company www systemapolska pl ...
Page 31: ...Heat exchanger gas unit Main board operation ...
Page 49: ...Smart Energy Company www systemapolska pl Commissioning procedure start up ...
Page 56: ...HEGU procedure to put in Hi Lo power Smart Energy Company www systemapolska pl ...
Page 58: ...Supply pressure in countries Smart Energy Company www systemapolska pl Tabele 5 1 page 44 ...
Page 74: ...Heat exchanger gas unit Troubleshooting Smart Energy Company www systemapolska pl ...
Page 97: ...Smart Energy Company www systemapolska pl THANK YOU FOR ATTENTION ...