![Lennox 70LENX1000 Manual Download Page 46](http://html1.mh-extra.com/html/lennox/70lenx1000/70lenx1000_manual_1877998046.webp)
Pre commissioning action
Smart Energy Company
www.systemapolska.pl
Make sure the gas in the mains corresponds to that for which
EOLO LX is regulated – Gas pressure & type comply with the
data on name plate
Check, with the pressure intake "IN" on the gas valve, that
pressure entering the valve corresponds to that required for
the type of gas being used.
Purge the gas pipe
Check tightness of gas system
Check Correctness of electrical connection / Voltage value,
Check that efficient earthing connections have been completed,
carried out as specified by current safety regulations
Tabele 5.1, page 44
Summary of Contents for 70LENX1000
Page 9: ...Burner units model E Baltic C D E box Smart Energy Company www systemapolska pl ...
Page 10: ...Burner units model E Baltic F G H box Smart Energy Company www systemapolska pl ...
Page 31: ...Heat exchanger gas unit Main board operation ...
Page 49: ...Smart Energy Company www systemapolska pl Commissioning procedure start up ...
Page 56: ...HEGU procedure to put in Hi Lo power Smart Energy Company www systemapolska pl ...
Page 58: ...Supply pressure in countries Smart Energy Company www systemapolska pl Tabele 5 1 page 44 ...
Page 74: ...Heat exchanger gas unit Troubleshooting Smart Energy Company www systemapolska pl ...
Page 97: ...Smart Energy Company www systemapolska pl THANK YOU FOR ATTENTION ...