14
• Once you have prepared the working area and the blower in accordance with the description, connect the blower
to the mains voltage.
• Switch the blower on via the
toggle switches (5)
.
• Before adjusting the temperature on the connected hot air device, make sure that there is enough air escaping.
• Switch the blower off via the
toggle switches (5)
. When the
toggle switches (5)
have been switched off, the
outlet below will also be switched off.
• When both
toggle switches (5)
have been switched off, the blower turns itself off automatically after approx.
5 minutes (cool-down function).
• After the blower has been shut off, disconnect the
power cord (1)
from the mains.
6.3 Switching on the blower
6.4 Switching off the blower
• Do not use aggressive substances to clean the
housing (3)
.
• Check the
power cord (1)
and plug before every use. These may not be damaged.
• Check the blower filter mats at least every 2 months. In case of extremely dirty ambient conditions, the filter must
be checked sooner.
First disconnect the
power cord (1)
from the power supply and then open the housing cover (6 screws).
For the blower below, loosen and remove the two cover screws. The filter mats are located below.
6.5 Maintenance
Summary of Contents for AIRSTREAM ST
Page 66: ...66 RUS Leister AIRSTREAM ST 1 AIRSTREAM ST FI...
Page 69: ...69 5 5 1 8 9 200 4 6 6 1 1 2 7 7 6 8 6 2...
Page 70: ...70 5 5 5 5 5 1 6 3 6 4 3 1 2 1 6 6 5...
Page 73: ...73 CN Leister AIRSTREAM ST 1 AIRSTREAM ST...
Page 76: ...76 5 5 1 8 9 200 L min 4 6 6 1 1 2 7 7 6 8 6 2...
Page 77: ...77 5 5 5 5 5 1 6 3 6 4 3 1 1 6 6 5...
Page 79: ...79 Pb Hg Cd Cr VI PBB PBDE PCB SJ T 11364 GB T 26572 GB T 26572...