Alpin Z300 3 Installation manual
Lehner Lifftechnik GmbH
Connection beam
The connection beam serves to connect the lift mast with the sidewall and the whole structure
with the building. Weight of connection beam is approximately 22 kg.
VERY IMPORTANT: The connection beam has to be fixed to the upper landing (structure of
the building) in order to provide the necessary stability to the system
The Platform Carriage
The platform carriage is delivered assembled, including the platform gate as specified in the
order form. If necessary, you can change the direction of opening the gates on the installation
site (It is necessary to change the location of electronic locks). Before the connection to the lift
mast the cover sheet on the carriage must be removed.
Weight of the carriage with enclosure and gate is approximately 200 kg.
Fixings to the
lift mast
Fixings to the
side wall
Fixings to the
upper level
Removeable front
covers
Plates for fixing
to tower