
Alpin Z300 6 Installation manual
Lehner Lifftechnik GmbH
Installation procedure:
Step 1:
Transport mast to installation site. Depending on the length and weight of the mast a
forklift or a cable pull will be necessary to erect the lift mast.
Step 2:
Connect the connection beam to the upper level at the correct height (according to
installation drawing)!
Step 3:
Erect the tower in the correct place and fix it to the connection beam.